Massimov visited foundry shop at Pavlodar Electrolysis plant
The Prime Minister highly appraised work of the enterprise's staff. This year the Pavlodar Electrolysis Plant was officially registered at the London Stock Exchange which confirmed international standards of the products of the plant and allowed supplying primary aluminum at market prices.
The plant implements integrated systems of management including the system of quality, environmental protection, protection of health and labor safety.
According to President of Kazakhstan Electrolysis Plant Almaz Ibragimov, the enterprise meets all international ecological requirements. The plant has developed and realizes the policy of environment's protection.
A unique gas treatment system which can capture up to 99.9% of emissions functions here.
In the first half of 2009 the plant has produced 91.5 thousand tons of "wing metal" - 122.4% against the same period in 2008.
Akim of the region Bakhytzhan Sagintayev accompanies the Prime Minister in his trip.